Helm
More wires have been run to the helm with some connected to some switches.


Galley
Running more wire through the galley. The radome power has been run – but coiled at the end while waiting to be run through roof. The two 10 AWG (to power the distribution/fuse boxs) have been (mostly) run.


Annoyed that my spool of 10 AWG had two lengths in it. This forced me to connect them and removed the benefit of a clean run.
